Power-Substation-at-Podili
Construction of #400KV Podili Sub-Station Along With 2 Nos. 400 KV Feeder and 1 no. 315 MVA 400/220 KV Transformer Bay at Sattednaplli Sub-Station on turn key Basis #AndhraPradesh.
The project involves supply, erection, testing and commissioing of 400KV QMDC line from 400kV twin moose DC line from Podili 400kV substation to Sattenapalli 400kV substation.
|