The project is specially designed to lift water from the River Godavari to irrigate more than 600,000 acres (2,400 km2) in the drought prone Telangana state, India. Later it was named after the politician J. Chokkarao as the 'J. #Chokkarao #Devadula lift irrigation scheme. The minimum river water level required is 73 m MSL in the river to pump the water whereas the non-monsoon / lean season river water level is below 71 m MSL. No downstream weir is yet constructed to build up the river minimum water level at this location of the river.The maximum water lift is by 510 meters. The project operational requirement is 484 MW power and 1.4 billion KWh of electrical energy annually for pumping 38 Tmcft water.[4] This lift canal is an inter river basin transfer link by feeding Godavari River water to Krishna River basin in Warangal and Nalgonda districts. #bestprojectsinindia #asianbestproject #indianbestprojects
|
No comments:
Post a Comment
Thanks you